Input material: manure (cows), renewable raw materials
Power: 1 MW
Commissioning year: Dezember 2007
This plant was enlarged in December 2009 from 526 kW to a total of 1 MW. The customer had his satellite CHP with 526 kW installed about 700m away from his plant in the city of Tangeln. Via a district heating system the city can now be provided with bioenergy.
» Download Flyer